Nationwide Civil - News

Wesfarmers Curragh – Dozer Trap Operation - Train Loadout

Nationwide Civil have been awarded the Dozer Trap Operation for the forthcoming Reclaimer Shutdown. The work involves pushing coal into two large dozer traps which in turn place coal on the loadout conveyor to the trains.

The operation requires three D10 dozers operating 24 hours per day, 7 days per week to surge load the dozer traps for a production of approximately 3000m3 per hour.   We are proud that our client has trusted this vital operation to Nationwide Civil.