Nationwide Civil have recently been awarded a continuation of our road maintenance works on the Central and Southern Access Roads. 
Bidgerley Tailings Dam Stage 2 - South Walker Creek Mine
The raising of the Bidgerley Tailings Dam at the South Walker Creek mine 140km west of Mackay was an important project due to increased demands and production in Australia’s Coal Industry. These works included raising two kilometres of existing dam embankment. The filter zone construction is an integral part to the dams operation and was constructed whilst at 80% capacity. The spillway design included the installation of a heavy duty polyethylene liner.Project: Tailings Dam Stage 2
Project Duration: July 2006 to September 2006
Project Value: $1.2 million
Client: BGC Contracting P/L
Contact: Warren Butler: 0428 656 212
Position: Project Manager
Project Components
- Embankment cut to fill 450,000m3
- Spillway construction
- Filter wall construction
- Major Plant Hire and Labour Supplier

