Carborough Downs Haul Road Construction

The construction of the Carborough Downs mine site included 12km of haul road for the transport of coal from the underground mine to newly constructed wash plant and load out facility. The abovementioned works included the sourcing and producing of all pavement materials and rock protection for the multiple converts installed.

Project:                     Haul Road Construction
Project Duration:     November 2005 to July 2006
Project Value:          $2.5 million
Client:                      Carborough Downs Joint Venture
Contact:                   John Evans:  0408 773 896
Position:                  Construction Manager


Project Components

  • Produce 150,000 tonnes of pavement materials
  • 12km haul road pavement construction
  • Construction of 3 water storage dams
  • Major Plant Hire and Labour Supplier